Your whole semester on one page! Register free, add your course, year & semester — and get your syllabus, notes, question banks & PYQs in one place. Register here
UniversityAcademy app icon
Get the free Android app — AKTU notes, question banks, PYQs & syllabus on your phone
GET IT ONGoogle Play
Cover of Quantity Surveying and Cost Estimation Syllabus (ETCE-306)
FREE

Quantity Surveying and Cost Estimation Syllabus (ETCE-306)

Quantity Surveying and Cost Estimation ETCE-306

All syllabus, notes, question bank & PYQ for this subject

  • English
  • Semester 6
  • 0 downloads
  • 0 views
Official GGSIPU syllabus of Quantity Surveying and Cost Estimation (ETCE-306): units, topics, course outcomes and recommended books. Read it online or download the PDF.

Syllabus — Quantity Surveying and Cost Estimation

Download PDF

ETCE-306 · 4 credits · L-T-P 3-1-0

GGSIPU B.Tech | Paper code ETCE-306 | L-T-P 3-1-0 | Credits 4

Objective: To learn the fundamentals of estimation of different types of civil engineering structures, analysis of rates and valuation concepts. The course also deals with different method of depreciation and valuation of properties including case studies.

Unit 1

Estimating Principle: Method of estimating, Main items of work, Deduction for openings, R.C.C. and R.B. work, Estimation for Flooring, Roofing, Plastering, Pointing Cornice, Doors, Windows, Wood Work, Iron Work, Aluminum work and Lump sum items Earthwork Calculations: Calculation of areas, Measurement of earthwork, Determination of Earthwork for reservoirs from contour map.

  • [T1][No. of Hours: 11]

Unit 2

RCC works and Structure: Estimate of RCC Slab, beam, T beam, Column with foundation, staircase, retaining wall etc. Road Estimating: Earthen, WBM and RCC roads, Premix carpeting, Stabilized soil road, Modernization of a road.

  • [T2][No. of Hours: 11]

Unit 3

Analysis of Rates for building work: Purpose and principal factors affecting the rate of an item of work, overhead costs, Materials for brick masonry, stone masonry, cement concrete, cement mortar, Plastering, different types of flooring, floor finish, color washing, distemper, varnish, painting, items for sanitary work, wood work, preparing analysis of rates. Analysis of Rates for Road works: Bituminous painting 1st and 2nd coats, Premix carpet, bituminous macadam, Laying and Consolidation of stone metal and Kankar material. Itemized rates as per DSR [Delhi Schedule of Rates. [T1,T2][No. of Hours: 11]

Unit 4

Depreciation: Different methods of calculating depreciation-straight line method, declining balance method, sinking fund method, quantity Survey method, Depreciated Cost, Case Studies Valuation: Cost of engineering services, rent fixation, valuation of properties, methods of valuation, book value, market value, profit and loss, scrap value, salvage value, Evaluation of projects, Annual cost method, rate of return method, benefit cost ratio method, Case Studies. [T1,R5][No. of Hours: 12]

Text Books

  • [T1] B. N. Dutta- Estimating and costing in Civil Engg, UPSPD.
  • [T2] M .Chakraborty, “Estimating costing and Specifications in Civil Engg”,

Reference Books

  • [R1] D.S.R. [Delhi Schedule Rates] C.P.W.D
  • [R2] PWD Account Code
  • [R3] Samuelson and Nardhaus-Economics, Mc Graw Hill
  • [R4] ‘Text book of Estimating and Costing’ by G.S.Birdie
  • [R5] ‘Civil Engineering Building Drawing’ by Gurucharan Singh

July, 2014.

Prepared from the official GGSIPU syllabus. Please check the latest official notification on ipu.ac.in for any change.

Ratings & Reviews

No reviews yet — share your experience with this item.

Write a review

Used this resource? Share your rating to help other students.

Write a review